Area

Area

170 m2

Architect

Architect

Ing. arch. Karel HaĊĦek

Disposition

Disposition

5+kk

Documents preparation

Documents preparation

8 weeks

Production time

Production time

5 weeks

Construction time

Construction time

8 weeks

 Operating cost of the house for one day is the same as one lunch costing

Operating cost of the house for one day is the same as one lunch costing

15,- CHF

Under the walnut tree photo 4
« Terraces All houses Vertu »